Confirm who controls the work
Identify the owner, facility contact, electrical contractor, and any party responsible for isolation or removal. A buyer should not assume that an offer includes de-energization, disconnection, environmental work, or building repairs.
Document the pre-removal state
Photograph the installation, labels, connections, supports, containment, and surrounding surfaces before anything changes. This preserves useful facts and helps separate equipment condition from removal damage.
Do not improvise isolation or draining
Electrical isolation, rigging, fluid handling, and waste decisions should be addressed by qualified personnel under an appropriate plan. Oil and PCB details need identification and compliance review, not assumptions based on age or appearance.
Describe the post-removal handoff
Tell the buyer whether the unit will remain on site, be staged, be loaded, or be transferred to another location. State what has actually been completed and avoid promising exact timing or a completed removal scope without confirmation.